Loading...
Loading...
The IICRC S520 Standard for Professional Mold Remediation is the benchmark document governing how certified restoration contractors must assess, contain, remediate, and verify the clearance of mould-affected property. The 2025 edition is the current published version.
S520 is the technical reference for mould remediation in Australia's insurance claims context. AFCA and the Insurance Council of Australia recognise S520 methodology as the industry standard for assessing whether a mould remediation scope is technically reasonable. An independent S520-compliant assessment from a certified contractor is the primary tool for challenging an inadequate insurer scope or a mould exclusion applied to a covered water damage event.
IICRC official information: iicrc.org/standards
Mould insurance claims in Australia are disputed more frequently than most other damage types. The most common insurer positions and how S520 methodology addresses each:
An S520-compliant mould assessment generates documentation that covers:
NRPG collects your contact and property details to coordinate contractor matching. See our Privacy Policy.
Clearance testing verifies that mould remediation is complete by confirming that airborne spore counts in the remediated area are at or below outdoor baseline levels. Under S520 methodology, clearance testing must be conducted:
Clearance testing matters for your claim because it establishes completion. If your insurer's contractor completed remediation without clearance testing, you have no documented basis for knowing whether remediation was effective. If mould recurs after a remediation that lacked clearance testing, the insurer cannot demonstrate that the remediation met S520 requirements — which supports a supplementary or repeat-scope claim.
AFCA (Australian Financial Complaints Authority) is the free, independent dispute resolution service for insurance complaints. Mould claims are among the most frequently escalated claim types at AFCA because they involve causation disputes that are difficult to resolve at insurer level.
For a successful AFCA mould claim outcome, the following documentation is most useful:
Lodge a mould claim AFCA dispute at afca.org.au. No cost to lodge. NRPG does not control claim outcomes — AFCA and your insurer determine final decisions.
What IICRC S500:2025 means for your flood or water damage claim.
IICRC S700:2025 fire and smoke damage restoration — policyholder guide.
Queensland disaster recovery — QLD March 2026 floods and TC Maila.
NSW disaster recovery — April 2026 storms, Liverpool and Fairfield claims.
Understanding underinsurance and how to identify shortfalls in your policy.
Get connected with IICRC certified contractors in your area
Request an S520-Compliant Mould Assessment